با سلام خدمت کاربران در صورتی که با خطای سیستم پرداخت بانکی مواجه شدید از طریق کارت به کارت (6037997535328901 بانک ملی ناصر خنجری ) مقاله خود را دریافت کنید (تا مشکل رفع گردد).
دسته بندی:
سیستم های خبره - expert systems
سال انتشار:
2019
عنوان انگلیسی مقاله:
A knowledge-based expert system to assess power plant project cost overrun risks
ترجمه فارسی عنوان مقاله:
یک سیستم خبره مبتنی بر دانش برای ارزیابی هزینه ریسک بیش ازحد پروژه نیروگاهی
منبع:
Sciencedirect - Elsevier - Expert Systems With Applications, 136 (2019) 12-32: doi:10:1016/j:eswa:2019:06:030
نویسنده:
Muhammad Saiful Islam a , Madhav P. Nepal b , ∗, Martin Skitmore b , Golam Kabir c
چکیده انگلیسی:
Preventing cost overruns of such infrastructure projects as power plants is a global project management problem. The existing risk assessment methods/models have limitations to address the complicated na- ture of these projects, incorporate the probabilistic causal relationships of the risks and probabilistic data for risk assessment, by taking into account the domain experts’ judgments, subjectivity, and un- certainty involved in their judgments in the decision making process. A knowledge-based expert system is presented to address this issue, using a fuzzy canonical model (FCM) that integrates the fuzzy group decision-making approach (FGDMA) and the Canonical model ( i.e. a modified Bayesian belief network model) . The FCM overcomes: (a) the subjectivity and uncertainty involved in domain experts’ judgment, (b) sig- nificantly reduces the time and effort needed for the domain experts in eliciting conditional probabilities of the risks involved in complex risk networks, and (c) reduces the model development tasks, which also reduces the computational load on the model. This approach advances the applications of fuzzy-Bayesian models for cost overrun risks assessment in a complex and uncertain project environment by addressing the major constraints associated with such models. A case study demonstrates and tests the application of the model for cost overrun risk assessment in the construction and commissioning phase of a power plant project, confirming its ability to pinpoint the most critical risks involved ̶ in this case, the complex- ity of the lifting and rigging heavy equipment, inadequate work inspection and testing plan, inadequate site/soil investigation, unavailability of the resources in the local market, and the contractor’s poor plan- ning and scheduling.
Keywords: Cost overruns | Risk assessment | Power plant projects | Fuzzy logic | Canonical model
قیمت: رایگان
توضیحات اضافی:
تعداد نظرات : 0