دانلود مقاله انگلیسی رایگان:مدیریت ارزش به دست آمده مبتنی بر عدد Z (ZEVM): سهم عملگرا جدید نسبت به ارزیابی هزینه تمام شده احتمالی - 2020
دانلود بهترین مقالات isi همراه با ترجمه فارسی 2

با سلام خدمت کاربران در صورتی که با خطای سیستم پرداخت بانکی مواجه شدید از طریق کارت به کارت (6037997535328901 بانک ملی ناصر خنجری ) مقاله خود را دریافت کنید (تا مشکل رفع گردد). 

دانلود مقاله انگلیسی مدیریت پروژه رایگان
  • Z-number based earned value management (ZEVM): A novel pragmatic contribution towards a possibilistic cost-duration assessment Z-number based earned value management (ZEVM): A novel pragmatic contribution towards a possibilistic cost-duration assessment
    Z-number based earned value management (ZEVM): A novel pragmatic contribution towards a possibilistic cost-duration assessment

    دسته بندی:

    مدیریت پروژه - Project Management


    سال انتشار:

    2020


    عنوان انگلیسی مقاله:

    Z-number based earned value management (ZEVM): A novel pragmatic contribution towards a possibilistic cost-duration assessment


    ترجمه فارسی عنوان مقاله:

    مدیریت ارزش به دست آمده مبتنی بر عدد Z (ZEVM): سهم عملگرا جدید نسبت به ارزیابی هزینه تمام شده احتمالی


    منبع:

    Sciencedirect - Elsevier - Computers & Industrial Engineering, 143 (2020) 106430. doi:10.1016/j.cie.2020.106430


    نویسنده:

    Sepehr Hendiania, Morteza Bagherpoura, Amin Mahmoudib, Huchang Liaoc,⁎


    چکیده انگلیسی:

    The Earned value management (EVM) is one of the simplified analytical cost-duration assessment tools which assist project managers in monitoring the status of the project undertaken. The EVM has been elaborated by both deterministic and uncertain numbers such as fuzzy logic in the light of time. Even though cost-duration analysis is so sensitive and fluctuating in projects, the adopted approaches were unable to consider the conspicuous unreliability which is always involving the decision-making data. This problem impedes project managers to trust the foreseen inferences. To help in overcoming this critical deficiency, Z-numbers were proposed to take possibilities and reliabilities into account. Applying Z-numbers and possibilistic modeling in the EVM is a challenging topic which causes the accuracy of cost-duration tracing results to be significantly enhanced. This paper presents the application of z-numbers for modeling the earned value indicators and proves the superiority of the ZEVM against traditional fuzzy EVM. This work originally adds to the state-of-the-art literature on earned value management by presenting a proposal and applications of a new as Z-Earned Value Management (ZEVM). An illustrative case is resolved to magnify the capability of the proposed framework in dealing with higher levels of uncertainty associated with decision-making data.
    Keywords: Earned value management | Fuzzy sets | Project evaluation | Uncertainty | Z-number


    سطح: متوسط
    تعداد صفحات فایل pdf انگلیسی: 15
    حجم فایل: 4691 کیلوبایت

    قیمت: رایگان


    توضیحات اضافی:




اگر این مقاله را پسندیدید آن را در شبکه های اجتماعی به اشتراک بگذارید (برای به اشتراک گذاری بر روی ایکن های زیر کلیک کنید)

تعداد نظرات : 0

الزامی
الزامی
الزامی
rss مقالات ترجمه شده rss مقالات انگلیسی rss کتاب های انگلیسی rss مقالات آموزشی
logo-samandehi
بازدید امروز: 2063 :::::::: بازدید دیروز: 3097 :::::::: بازدید کل: 36330 :::::::: افراد آنلاین: 22