  • Qualitative and quantitative project risk assessment using a hybrid PMBOK model developed under uncertainty conditions Qualitative and quantitative project risk assessment using a hybrid PMBOK model developed under uncertainty conditions
    Qualitative and quantitative project risk assessment using a hybrid PMBOK model developed under uncertainty conditions

    دسته بندی:

    مدیریت بازرگانی - Business Management


    سال انتشار:

    2020


    عنوان انگلیسی مقاله:

    Qualitative and quantitative project risk assessment using a hybrid PMBOK model developed under uncertainty conditions


    ترجمه فارسی عنوان مقاله:

    ارزیابی کیفی و کمی ریسک پروژه با استفاده از یک مدل ترکیبی PMBOK که در شرایط عدم اطمینان ایجاد شده است


    منبع:

    Sciencedirect - Elsevier - Heliyon, Corrected proof, e03097: 10:1016/j:heliyon:2019:e03097


    نویسنده:

    Behrad Barghi


    چکیده انگلیسی:

    This study presented a qualitative and quantitative project risk assessment using a hybrid PMBOK model developed under uncertainty conditions. Accordingly, an exploratory and applied research design was employed in this study. The research sample included 15 experienced staff working in main and related positions in Neyr Perse Company. After reviewing the literature and the Project Management Body of Knowledge (PMBOK), 32 risk factors were identified and their number reduced to 17 risks using the expert opinions via the fuzzy Delphi technique run through three stages. The results of the confirmatory factor analysis showed that all risks were confirmed by the members of the research sample. Then the identified risks were structured and ranked using fuzzy DEMATEL and fuzzy ANP techniques. The final results of the study showed that the political and economic sanctions had the highest weight followed by foreign investors’ attraction and the lack of regional infrastructure.
    Keywords: Project risks | Project management body of knowledge(PMBOK) | Uncertainty | Mixed qualitative and quantitative risk | assessment approach | Mathematics | Probability theory | Engineering | Industrial engineering | Business


    سطح: متوسط
    تعداد صفحات فایل pdf انگلیسی: 22
    حجم فایل: 769 کیلوبایت

    قیمت: رایگان


    توضیحات اضافی:




اگر این مقاله را پسندیدید آن را در شبکه های اجتماعی به اشتراک بگذارید (برای به اشتراک گذاری بر روی ایکن های زیر کلیک کنید)

تعداد نظرات : 0

الزامی
الزامی
الزامی
rss مقالات ترجمه شده rss مقالات انگلیسی rss کتاب های انگلیسی rss مقالات آموزشی
logo-samandehi
بازدید امروز: 8480 :::::::: بازدید دیروز: 0 :::::::: بازدید کل: 8480 :::::::: افراد آنلاین: 70